{"id":32789,"date":"2023-08-30T06:36:58","date_gmt":"2023-08-30T12:36:58","guid":{"rendered":"https:\/\/elconspirador.com.mx\/?p=32789"},"modified":"2023-08-30T06:36:58","modified_gmt":"2023-08-30T12:36:58","slug":"construccion-de-palacio-de-justicia-va-retrasado","status":"publish","type":"post","link":"https:\/\/elconspirador.com.mx\/?p=32789","title":{"rendered":"CONSTRUCCI\u00d3N DE PALACIO DE JUSTICIA VA RETRASADO"},"content":{"rendered":"<p>Debido a los retrasos de los constructores, la obra del Palacio de Justicia presenta retrasos en su ejecuci\u00f3n, as\u00ed lo confirm\u00f3 la presidente del Tribunal Superior de Justicia, Mariela Ponce Villa.<\/p>\n<p>La obra tiene una proyecci\u00f3n para la inversi\u00f3n de m\u00e1s de 200 millones de pesos y la Secretar\u00eda de Desarrollo Urbano y Obras P\u00fablicas pretend\u00eda concluirla a m\u00e1s tardar en noviembre.<\/p>\n<p>&#8220;Vamos un poco retrasados o va un poco retrasada la obra. La fecha que se tiene para la entrega es el 17 de octubre, pero al cierre de la semana pasada llevamos un 63 por ciento de avance de la obra&#8221;.<\/p>\n<p>Sobre las causas del retraso, Ponce Villa se\u00f1al\u00f3 que es un asunto de los constructores, pero s\u00ed deber\u00e1 concluirse este mismo a\u00f1o.<\/p>\n<p>&#8220;Se tiene que terminar este a\u00f1o porque todos los recursos est\u00e1n con presupuesto de este a\u00f1o. Es el constructor, los tiempos de los constructores que est\u00e1n ejecutando la obra&#8221;.<\/p>\n<p>Cabe mencionar que las autoridades judiciales pretenden arrancar con el equipamiento a principios del siguiente a\u00f1o, a fin de poder trasladar las oficinas en el primer trimestre del 2024.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Debido a los retrasos de los constructores, la obra del Palacio de Justicia presenta retrasos en su ejecuci\u00f3n, as\u00ed lo confirm\u00f3 la presidente del Tribunal Superior de Justicia, Mariela Ponce Villa. La obra tiene una proyecci\u00f3n para la inversi\u00f3n de m\u00e1s de 200 millones de pesos y la Secretar\u00eda de Desarrollo Urbano y Obras P\u00fablicas pretend\u00eda concluirla a m\u00e1s tardar<\/p>\n<div class=\"h10\"><\/div>\n<p><a class=\"more-link2 flat\" href=\"https:\/\/elconspirador.com.mx\/?p=32789\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":1,"featured_media":32790,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false},"categories":[1],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/32789"}],"collection":[{"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=32789"}],"version-history":[{"count":1,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/32789\/revisions"}],"predecessor-version":[{"id":32791,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/32789\/revisions\/32791"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=\/wp\/v2\/media\/32790"}],"wp:attachment":[{"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=32789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=32789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elconspirador.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=32789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}